Schedules
Module 01
Fixed Asset Register
Asset master, depreciation schedules (SLM & WDV), trial balance reconciliation and disposal management.
Gross Block
โ€”
Total cost
Acc. Depreciation
โ€”
Cumulative
Net Book Value
โ€”
Closing balance
This Period Dep.
โ€”
Current month
TB Variance
โ€”
vs Data Hub
Asset Master
Depreciation Schedule
TB Reconciliation
Journal Entries
Import
Add / Edit Asset
๐Ÿ“‹ Schedule II reference rate will appear here
CodeAsset NameCategoryMethodGross CostAcc. Dep.NBV TodayDep. Rate %Projected ClosureStatus
Depreciation Schedule
Asset Roll-Forward All Assets ยท Current FY
Fixed Assets โ€” Trial Balance Reconciliation

Click Reconcile to compare register vs Data Hub trial balance.

Depreciation Journal Entries
Import Fixed Assets from CSV

๐Ÿ“‚ Click or drag & drop a CSV file here

Required columns: code, name, category, cost, method, rate, start_date  |  Optional: purchase_date, currency, residual_pct, acc_dep_bf, location, supplier
CSV Template

code,name,category,currency,cost,acc_dep_bf,residual_pct,method,rate,purchase_date,start_date,location,supplier,status,notes
FA-001,Dell Server R740,computers,INR,350000,0,5,WDV,31.67,2023-04-01,2023-05-01,IT Dept,Dell India,active,
FA-002,Office Furniture Set,furniture,INR,120000,24000,5,SLM,6.33,2022-08-15,2022-09-01,HO,Office Mall,active,

Month-End Close Pack SVGR Advisory
๐Ÿ”’

Your month-end close pack is ready

We've drafted every closing journal and schedule tie-out โ€” depreciation, prepayment amortisation, accruals & reversals, loan interest โ€” so the books close clean and on time. Unlock it with a free 20-minute review.

Module 02
Prepayment Schedule
Multi-period prepayments, monthly amortisation releases, unexpired balance reconciliation and P&L variance.
Total Prepaid (BS)
โ€”
Unexpired balance
This Period Release
โ€”
P&L charge due
Overdue (Unexpensed)
โ€”
Benefit period expired
Active Prepayments
โ€”
Open items
Active Prepayments
Release Schedule
Import
Add Prepayment
RefDescriptionVendorCCYAmountBenefit PeriodMonthly ReleaseReleased to DateBalance (BS)Status
Monthly Release Schedule
Import Prepayments from CSV

๐Ÿ“‚ Click or drag & drop CSV

Required: ref, desc, amount, benefit_start, benefit_end  |  Optional: vendor, currency, fx_rate, payment_date, exp_account
Module 03
Accruals & Reversals
Period-end accruals, auto-reversal tracking, estimate vs actual variance and period lock controls.
Total Accrued (BS)
โ€”
Current period liability
Pending Reversals
โ€”
Awaiting reversal
Estimate Variance
โ€”
Accrual vs actual invoice
Period Status
โ€”
Lock / Open
Accruals Register
Reversal Tracker
Import
Add Accrual
RefDescriptionPeriodCCYEstimatedActual Inv.VarianceRev. StatusExp. Account
Reversal Tracker & Period Lock
โ— Period Open

No accruals added yet.

Import Accruals from CSV

๐Ÿ“‚ Click or drag & drop CSV

Required: ref, desc, period, amount  |  Optional: currency, fx_rate, exp_account, acc_account, inv_date, inv_amount
Module 04
Loan Amortisation โ€” EIR
Full Effective Interest Rate (Ind AS 109 / IFRS 9) amortisation schedule with Newton-Raphson EIR solver, forex revaluation and P&L variance.
Total Carrying Amount
โ€”
All loans combined
EIR Interest This Period
โ€”
P&L finance cost
Coupon Due This Period
โ€”
Cash outflow
FX Revaluation
โ€”
Exchange gain / (loss)
Loan Master
EIR Schedule
Import
Add Loan
RefDescriptionLenderCCYFace ValueCarrying AmountEIR %Coupon %MaturityStatus
EIR Amortisation Table
Import Loans from CSV

๐Ÿ“‚ Click or drag & drop CSV

Required: ref, face_value, coupon_rate, start_date, maturity_date  |  Optional: desc, lender, currency, tx_costs, freq, payment_amount
Module 05
Variance Analysis
Consolidated schedule vs ledger reconciliation. Schedule Says = the carrying value computed by this tool (depreciation, amortisation, EIR). Ledger Shows = the balance pulled from the Data Hub raw ledger for the matching GL account. Connect to Data Hub to auto-populate the Ledger column and compute variances.
โ„น No Ledger Data = Data Hub not connected. Open Data Hub, import raw ledger, then return here โ€” variances populate automatically from GL balances.  ยท  Amber = variance exists but within your configured materiality threshold (Settings & FX panel).  ยท  Material Var. = variance exceeds threshold โ€” investigate before month-end close.
Reconciled
โ€”
Amber
โ€”
Material Var.
โ€”
Total Variance
โ€”
ModuleItemSchedule SaysLedger ShowsVarianceStatusNote
Configuration
Settings & FX Rates
Global depreciation policy, materiality thresholds, foreign exchange rates per period and Schedule II reference rates.
Global Settings
FX Rates โ€” Current Period

Enter rates as 1 USD/AUD/GBP/AED/SGD = X INR (or X reporting currency). Used for translating foreign currency balances.

Schedule II Reference Rates (India โ€” Companies Act 2013)
CategoryUseful LifeSLM Rate %WDV Rate %Residual
Buildings (Factory)30 yrs3.17%10.34%5%
Buildings (Non-Factory / Office)60 yrs1.58%5.00%5%
Plant & Machinery (General)15 yrs6.33%18.10%5%
Furniture & Fittings10 yrs9.50%25.89%5%
Vehicles (Motor Cars)8 yrs11.88%31.23%5%
Computers & IT Equipment3 yrs31.67%63.16%5%
Office Equipment5 yrs19.00%45.07%5%
Intangible Assets (Software)3 yrs33.33%โ€”0%
Audit Compliance
Audit Trail
Immutable log of all additions, edits, deletions and period locks across all schedule modules.

No audit entries yet.

This is a demo with sample data. Want your real month-end close run for you โ€” depreciation, prepayments, accruals, loan schedules, journals, clean tie-outs? CA-led close.