Module 01
Fixed Asset Register
Asset master, depreciation schedules (SLM & WDV), trial balance reconciliation and disposal management.
Gross Block
โ
Total cost
Acc. Depreciation
โ
Cumulative
Net Book Value
โ
Closing balance
This Period Dep.
โ
Current month
TB Variance
โ
vs Data Hub
Add / Edit Asset
๐ Schedule II reference rate will appear here
| Code | Asset Name | Category | Method | Gross Cost | Acc. Dep. | NBV Today | Dep. Rate % | Projected Closure | Status |
|---|
Depreciation Schedule
Asset Roll-Forward All Assets ยท Current FY
Fixed Assets โ Trial Balance Reconciliation
Click Reconcile to compare register vs Data Hub trial balance.
Depreciation Journal Entries
Import Fixed Assets from CSV
๐ Click or drag & drop a CSV file here
Required columns: code, name, category, cost, method, rate, start_date | Optional: purchase_date, currency, residual_pct, acc_dep_bf, location, supplierCSV Template
code,name,category,currency,cost,acc_dep_bf,residual_pct,method,rate,purchase_date,start_date,location,supplier,status,notes
FA-001,Dell Server R740,computers,INR,350000,0,5,WDV,31.67,2023-04-01,2023-05-01,IT Dept,Dell India,active,
FA-002,Office Furniture Set,furniture,INR,120000,24000,5,SLM,6.33,2022-08-15,2022-09-01,HO,Office Mall,active,
Month-End Close Pack SVGR Advisory
Module 02
Prepayment Schedule
Multi-period prepayments, monthly amortisation releases, unexpired balance reconciliation and P&L variance.
Total Prepaid (BS)
โ
Unexpired balance
This Period Release
โ
P&L charge due
Overdue (Unexpensed)
โ
Benefit period expired
Active Prepayments
โ
Open items
Add Prepayment
| Ref | Description | Vendor | CCY | Amount | Benefit Period | Monthly Release | Released to Date | Balance (BS) | Status |
|---|
Monthly Release Schedule
Import Prepayments from CSV
๐ Click or drag & drop CSV
Required: ref, desc, amount, benefit_start, benefit_end | Optional: vendor, currency, fx_rate, payment_date, exp_accountModule 03
Accruals & Reversals
Period-end accruals, auto-reversal tracking, estimate vs actual variance and period lock controls.
Total Accrued (BS)
โ
Current period liability
Pending Reversals
โ
Awaiting reversal
Estimate Variance
โ
Accrual vs actual invoice
Period Status
โ
Lock / Open
Add Accrual
| Ref | Description | Period | CCY | Estimated | Actual Inv. | Variance | Rev. Status | Exp. Account |
|---|
Reversal Tracker & Period Lock
โ Period Open
No accruals added yet.
Import Accruals from CSV
๐ Click or drag & drop CSV
Required: ref, desc, period, amount | Optional: currency, fx_rate, exp_account, acc_account, inv_date, inv_amountModule 04
Loan Amortisation โ EIR
Full Effective Interest Rate (Ind AS 109 / IFRS 9) amortisation schedule with Newton-Raphson EIR solver, forex revaluation and P&L variance.
Total Carrying Amount
โ
All loans combined
EIR Interest This Period
โ
P&L finance cost
Coupon Due This Period
โ
Cash outflow
FX Revaluation
โ
Exchange gain / (loss)
Add Loan
| Ref | Description | Lender | CCY | Face Value | Carrying Amount | EIR % | Coupon % | Maturity | Status |
|---|
EIR Amortisation Table
Import Loans from CSV
๐ Click or drag & drop CSV
Required: ref, face_value, coupon_rate, start_date, maturity_date | Optional: desc, lender, currency, tx_costs, freq, payment_amountModule 05
Variance Analysis
Consolidated schedule vs ledger reconciliation. Schedule Says = the carrying value computed by this tool (depreciation, amortisation, EIR). Ledger Shows = the balance pulled from the Data Hub raw ledger for the matching GL account. Connect to Data Hub to auto-populate the Ledger column and compute variances.
โน No Ledger Data = Data Hub not connected. Open Data Hub, import raw ledger, then return here โ variances populate automatically from GL balances. ยท Amber = variance exists but within your configured materiality threshold (Settings & FX panel). ยท Material Var. = variance exceeds threshold โ investigate before month-end close.
Reconciled
โ
Amber
โ
Material Var.
โ
Total Variance
โ
| Module | Item | Schedule Says | Ledger Shows | Variance | Status | Note |
|---|
Configuration
Settings & FX Rates
Global depreciation policy, materiality thresholds, foreign exchange rates per period and Schedule II reference rates.
Global Settings
FX Rates โ Current Period
Enter rates as 1 USD/AUD/GBP/AED/SGD = X INR (or X reporting currency). Used for translating foreign currency balances.
Schedule II Reference Rates (India โ Companies Act 2013)
| Category | Useful Life | SLM Rate % | WDV Rate % | Residual |
|---|---|---|---|---|
| Buildings (Factory) | 30 yrs | 3.17% | 10.34% | 5% |
| Buildings (Non-Factory / Office) | 60 yrs | 1.58% | 5.00% | 5% |
| Plant & Machinery (General) | 15 yrs | 6.33% | 18.10% | 5% |
| Furniture & Fittings | 10 yrs | 9.50% | 25.89% | 5% |
| Vehicles (Motor Cars) | 8 yrs | 11.88% | 31.23% | 5% |
| Computers & IT Equipment | 3 yrs | 31.67% | 63.16% | 5% |
| Office Equipment | 5 yrs | 19.00% | 45.07% | 5% |
| Intangible Assets (Software) | 3 yrs | 33.33% | โ | 0% |
Audit Compliance
Audit Trail
Immutable log of all additions, edits, deletions and period locks across all schedule modules.
No audit entries yet.